Patent · US Active

Identifying the best time to schedule a migration based on source and target system load

US12026389B1 · kind B1 · utility

0Cited by
1References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 31, 2023
Grant dateJul 2, 2024
Priority date
Expiry dateMar 24, 2043

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F3/0673
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Data migration between a source storage system and a target storage system is automated by calculating the optimal time window or group of consecutive time windows in which to execute the data migration, where optimality is defined in terms of source storage system and target storage system utilizations combined in a manner that accounts for differences between the source storage system and target storage system utilizations. Source and target storage system utilization scores are calculated for each of a plurality of time windows of at least one representative time period. A source-target load score is calculated for each of the time windows based on the source storage system utilization scores and the target storage system utilization scores. At least one of the time windows is selected based on the source-target load scores.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.