Patent · US Active

Dynamic automation of prerequisite component deployment in disconnected environments

US12026494B2 · kind B2 · utility

0Cited by
11References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 29, 2022
Grant dateJul 2, 2024
Priority date
Expiry dateNov 29, 2042

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2009/45579
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Systems and methods analyze for installing dependencies required for the installation of prerequisite components of cloud infrastructure to be installed in a disconnected environment are presented herein. An automation playbook generated after an assessment of a disconnected environment may be analyzed to determine a set of dependencies required by the automation playbook (e.g., packages and files required by each installation playbook called by the automation playbook). Each of the dependencies may be brought into the disconnected environment and installed as operating system packaging units, or deployed as containerized services. After all of the dependencies have been installed, a processing device may generate an installation report indicating whether the installation of each prerequisite component was successful or not. Upon determining that each of the prerequisite components was successfully installed, the processing device may install the cloud infrastructure on the disconnected environment.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.