Patent · US Active

Method for monitoring and analyzing large tunnel machines based on automatic collection of big data

US12037908B1 · kind B1 · utility

0Cited by
1References
10Claims
0Family size

Assignees

Inventors

Key dates

Filing dateDec 13, 2023
Grant dateJul 16, 2024
Priority date
Expiry dateDec 13, 2043

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21F17/18
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for monitoring and analyzing large tunnel machines based on automatic collection of big data includes the following steps: dividing a tunnel operation area, obtaining environmental information of a tunnel operation sub-area, analyzing rock drilling difficulty of the tunnel operation sub-area, confirming a tunnel operation trajectory, analyzing conformity of the tunnel operation sub-area, processing an abnormal tunnel operation sub-area, and analyzing health state of a tunnel rock drill. According to the present disclosure, a rock drilling difficulty coefficient of each tunnel operation sub-area is used to analyze a corresponding steel rotating speed, and then the tunnel operation trajectory is confirmed. After the tunnel operation is completed, the operation conformity of each tunnel operation sub-area is analyzed, and each abnormal tunnel operation sub-area is screened out and processed accordingly.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.