Method for carrying out servicing measures on an energy conversion installation

US12055063B2 · kind B2 · utility

0Cited by
1References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 22, 2020
Grant dateAug 6, 2024
Priority date
Expiry dateMay 16, 2041

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF05D2230/90
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A method for optimizing energy conversion installation service measures, wherein the energy conversion installation has at least the following machines: at least one gas turbine; at least one generator; and optionally at least one steam turbine; wherein repairs are carried out on the at least one machine, in particular a defective component or defective components of the at least one machine either is/are or will be replaced by a new, identical component or new, identical components and/or repaired; and wherein, while carrying out these repairs, further measures for extending the service life of machines or the components thereof and/or further measures for optimizing machines or the components thereof are carried out.