Provisional facility for retaining earth by using ground anchors and guide brackets for stepwise retention during deep excavation, and method for constructing same

US12060689B1 · kind B1 · utility

0Cited by
0References
7Claims
0Family size

Inventor

Key dates

Filing dateMay 25, 2023
Grant dateAug 13, 2024
Priority date
Expiry dateMay 25, 2043

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE02D2600/30
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A provisional facility for retaining earth using a guide bracket and a ground anchor for stepwise retention during deep excavation includes multiple thumb piles disposed vertically at predetermined intervals, a wale disposed across the multiple thumb piles, a guide bracket installed at a predetermined position of the wale, and a ground anchor having the other side anchored to a ground while a tensile member is wound around the guide bracket.