Concrete pouring guiding device and construction method for sewage treatment tank
US12060718B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 16, 2021 |
| Grant date | Aug 13, 2024 |
| Priority date | — |
| Expiry date | Jan 9, 2042 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02A20/208
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
Provided are a concrete pouring guiding device and a construction method for pouring a concrete tank wall of a sewage treatment tank, wherein the concrete pouring guiding device includes a guiding element and a mounting seat configured to be fixed on an external mounting position; the guiding element is threadedly engaged with the mounting seat, so as to enable the guiding element to move in a first direction with respect to the mounting seat; in the first direction, one end of the guiding element is configured to allow concrete to flow into the guiding element, and the other end of the guiding element is configured to extend to a target position; and the first direction is a length direction of the guiding element.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.