Patent · US Active

Concrete pouring guiding device and construction method for sewage treatment tank

US12060718B2 · kind B2 · utility

0Cited by
4References
13Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 16, 2021
Grant dateAug 13, 2024
Priority date
Expiry dateJan 9, 2042

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02A20/208
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Provided are a concrete pouring guiding device and a construction method for pouring a concrete tank wall of a sewage treatment tank, wherein the concrete pouring guiding device includes a guiding element and a mounting seat configured to be fixed on an external mounting position; the guiding element is threadedly engaged with the mounting seat, so as to enable the guiding element to move in a first direction with respect to the mounting seat; in the first direction, one end of the guiding element is configured to allow concrete to flow into the guiding element, and the other end of the guiding element is configured to extend to a target position; and the first direction is a length direction of the guiding element.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.