Background upgrade migration determination and implementation
US12063272B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 11, 2023 |
| Grant date | Aug 13, 2024 |
| Priority date | — |
| Expiry date | Jul 11, 2043 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L67/306
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Migration of a user of a computing device to accept an updated version of a software feature to the exclusion of a prior version of the software feature is implemented without user friction. Telemetry data corresponding to use of the updated version and of the prior version is stored. The telemetry data is evaluated utilizing a trained machine learning model trained using external telemetry data with respect to use of the updated version and to use of the prior version. A migration acceptance value indicative of whether the user will accept use of the updated version to exclusion of the prior version is calculated. The migration acceptance value is compared to a threshold value determined by the trained model. If the migration acceptance value exceeds the threshold value, the prior version is excluded from the user profile.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.