Patent · US Active

Waterflood management of production wells

US12078061B2 · kind B2 · utility

0Cited by
1References
35Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 21, 2021
Grant dateSep 3, 2024
Priority date
Expiry dateJul 21, 2041

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02A10/40
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method of waterflood management for reservoir(s) having production hydrocarbon-containing well(s) including injector well(s). A reservoir model has model parameters in a mathematical relationship relating a water injection rate to a total production rate of the production well including at least one of a hydrocarbon production rate and water production rate. A solver implements automatic differentiation utilizing training data regarding the reservoir including operational data that includes recent sensor and/or historical data for the water injection rate and the hydrocarbon production rate, and constraints for the model parameters. The solver solves the reservoir model to identify values or value distributions for the model parameters to provide a trained reservoir model. The trained reservoir model uses water injection schedule(s) for the injector well to generate predictions for the total production rate.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.