Method and system for estimating the drift of a clock for dating seismic data samples
US12078970B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Jun 19, 2019 |
| Grant date | Sep 3, 2024 |
| Priority date | — |
| Expiry date | Jun 17, 2041 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG01V2200/12
- WIPO fieldMeasurement
- WIPO sectorInstruments
Abstract
The method for estimating the drift over time of a physical operating parameter of a clock for dating seismic data samples associated with a seismic data collection node involves measuring (10) at least one quantity associated with the clock, at predetermined instants or during predetermined time periods, and applying (12), to this quantity, a predetermined non-linear law of variation of this quantity that depends on the values collected during the measurement step (10), so as to obtain an estimation of the drift over time of the physical operating parameter.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.