Method for monitoring resilience of shield tunnel based on multi-source heterogeneous data
US12091976B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 9, 2023 |
| Grant date | Sep 17, 2024 |
| Priority date | — |
| Expiry date | Aug 9, 2043 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/30
- WIPO fieldMeasurement
- WIPO sectorInstruments
Abstract
A method for monitoring resilience of a shield tunnel based on multi-source heterogeneous data is provided, including following steps: collecting the multi-source heterogeneous data and processing computer data, where the collecting the multi-source heterogeneous data includes: collecting a tunnel displacement u, a tunnel cross section convergence ΔD and a tunnel damage area S; and the processing computer data includes: S1, performing data preprocessing; S2, performing data processing, where the multi-source heterogeneous data preprocessed in step S1 is processed to calculate a tunnel performance indicator P and a tunnel resilience indicator Re; S3, determining tunnel status; S4, performing manual argumentation; S5, giving a remediation measure according to the status of the resilience of the tunnel in step S4; S6, storing and archiving processed data; and S7, performing terminal outputting, where the data obtained in step S6 is displayed and output through a plurality of terminals.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.