Patent · US Active

Integrated comprehensive adjustment method for pulverized coal boiler based on prevention and control of high-temperature corrosion of water wall

US12098844B2 · kind B2 · utility

0Cited by
3References
8Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 30, 2021
Grant dateSep 24, 2024
Priority date
Expiry dateAug 30, 2041

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E20/34
  • WIPO fieldThermal processes and apparatus
  • WIPO sectorMechanical engineering

Abstract

An integrated comprehensive adjustment method for a pulverized coal boiler based on high-temperature corrosion prevention and control of water wall is provided. The method includes: during shutdown period of the boiler, mounting reducing atmosphere sampling pipe on a water-cooled wall region; carrying out a diagnostic test on the boiler; carrying out an optimization and adjustment test of a boiler pulverizing system; carrying out a single-factor adjustment test of boiler-related parameters; determining degrees of influence of different parameters on water wall reducing atmosphere, thermal efficiency of the boiler and NOx concentration at a denitration inlet; carrying out an optimization test of ammonia spraying of a denitration system; carrying out a maximum safe denitration efficiency test; and finding a balance point among the water wall reducing atmosphere, the thermal efficiency of the boiler and the NOx concentration at the denitration inlet.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.