Resource management
US12101261B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 23, 2023 |
| Grant date | Sep 24, 2024 |
| Priority date | — |
| Expiry date | Mar 23, 2043 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L47/822
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
According to one aspect, a system for resource management may perform receiving a total resource request, a vector of two or more maximum available resources associated with two or more corresponding resource providers, and a number of resource providers and calculating an individual resource request for each of the two or more resource providers based on a classification number. Any resource provider having a maximum available resource less than or equal to the classification number may be assigned an individual resource request equal to their corresponding maximum available resource.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.