Well construction workflow selection and execution
US12116878B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 1, 2021 |
| Grant date | Oct 15, 2024 |
| Priority date | — |
| Expiry date | Apr 24, 2042 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B2200/22
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method for conducting wellsite activities includes receiving measured sensor data collected by one or more sensors in a wellsite construction rig, determining a data quality of the measured sensor data based on a plurality of data quality dimensions, predicting predicted sensor data using a model, comparing the measured sensor data with the predicted sensor data, determining an uncertainty of the measured sensor data based at least in part on the data quality and the comparison, and selecting one or more workflows for implementation using the one or more sensors, the wellsite construction rig, or both.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.