Method for optimizing the management of a flow of data
US12130793B2 · kind B2 · utility
Assignees
Inventors
Key dates
| Filing date | Mar 10, 2023 |
| Grant date | Oct 29, 2024 |
| Priority date | — |
| Expiry date | Mar 10, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG16Y30/00
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method is used for managing a flow of data in at least one database, wherein said database is configured with at least two data models of data storage. In said method, during a first period of time, a first data flow portion is received in a computer, and the first data flow portion is then stored in a first data pool of the database according to the first data model. Then, after the first period of time, a transformation is made on the first portion of the data and the transformed first data is assigned to a second data model, and the first data flow portion is then transferred from the first data pool to a second data pool. The process is repeated with at least a second data flow portion and can be extended to more transformations, and, thus, to more data models, and more data pools accordingly.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.