Mining method without coal pillars with roof-cutting and roadway retaining

US12168931B2 · kind B2 · utility

0Cited by
1References
6Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 30, 2021
Grant dateDec 17, 2024
Priority date
Expiry dateSep 5, 2041

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21F16/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A mining method is provided without coal pillars with roof-cutting and roadway retaining. This includes, comprising: constructing a gas drainage roadway and eliminating outbursts in a working face transport gate area and track gate area on opposite sides of a first mining working face; constructing various components with an air return roadway. Another end is communicated with the gas drainage roadway by the first process roadway, one end of the working face track gate is communicated with the air return roadway, the other end is communicated with the gas drainage roadway. A ventilation system is formed. This makes full use of the existing gas drainage roadway to meet the roadway layout requirements using the 110 construction method, increasing the use function of the roadway and increasing the reuse rate of the roadway, reducing the roadway engineering quantity before production, shortening the construction period and reduce the cost.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.