Validation of ETL pipeline using assert data
US12174849B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 4, 2023 |
| Grant date | Dec 24, 2024 |
| Priority date | — |
| Expiry date | May 4, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F16/215
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A computing system is provided, which is configured to instantiate a testing environment, define an extract, transform, load (ETL) pipeline within the testing environment, generate a test data set to be inputted into the ETL pipeline, generate assert data predicting an output of the ETL pipeline based on the generated test data set, input the test data set into the ETL pipeline to generate output data, compare the assert data to the output data, and validate the output data using the assert data to generate validation data.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.