Performing shutdown of a node in a database system
US12182588B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 9, 2023 |
| Grant date | Dec 31, 2024 |
| Priority date | — |
| Expiry date | Oct 9, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F9/442
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A node of a database system is operable to determine, at a first time, to prepare for a shutdown. The shutdown of the node is performed at a second time that is a period of time after the first time based on the node delaying the shutdown until a plurality of currently running processes being run by the node that initiated prior to the first time are determined to be complete. During the period of time after the first time and prior to performing the shutdown, a set of new processing requests are rejected by the node.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.