Remediation site portfolio risk scoring
US12182870B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 13, 2022 |
| Grant date | Dec 31, 2024 |
| Priority date | — |
| Expiry date | Jan 19, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06N3/09
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
The system may project and prioritize remediation timelines and costs, such that owners may prioritize spend across a portfolio of contaminated properties to maximize the overall effect of contamination remediation efforts, and to increase the likelihood of regulatory acceptance of proposed remediation strategies. The system may include a method for developing, an extreme event risk score based on operational environment data, legislative environment data and a data environment; determining a remediation score based on harm reduction data, cost data, sustainability data, resiliency data, the extreme event risk score and the data environment; determining a remediated risk score based on an initial risk score and the remediation score; determining a risk rating pre-remediation based on the initial risk score and an information depth score; and determining the risk rating post-remediation based on the remediated risk score and the information depth score.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.