Predictive block maintenance
US12189384B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 19, 2022 |
| Grant date | Jan 7, 2025 |
| Priority date | — |
| Expiry date | Dec 12, 2042 |
Classification
- Technology area (CPC F)Mechanical Engineering; Lighting; Heating
- CPC primaryF04B2201/00
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
Well completion design data for completing plural stages of a well completion operation is accessed. Predicted component life intervals for each of a plurality of components of a frac fleet are accessed. Remaining component life intervals for each of the plurality of components of the frac fleet are determined based on the predicted component life intervals. A continuous completion event for the well completion operation is set based on the remaining component life intervals for each of the plurality of components. The continuous completion event includes a continuous pumping block identifying one or more contiguous stages from among the plurality of stages during which the well completion operation is performed with the frac fleet, and a maintenance block identifying one or more of the plurality of frac pumps to be subject to predetermined maintenance operations upon completion of the one or more contiguous stages of the continuous pumping block.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.