Automatic microseismic monitoring-intelligent rockburst early warning integrated system and method for tunnel boring machine (TBM)-based construction
US12203373B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 22, 2022 |
| Grant date | Jan 21, 2025 |
| Priority date | — |
| Expiry date | May 5, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG01V2210/65
- WIPO fieldAudio-visual technology
- WIPO sectorElectrical engineering
Abstract
An automatic microseismic monitoring-intelligent rockburst early warning integrated system for TBM-based construction includes a partition plate, a guide rail, a sensor festoon bracket, a trolley festoon bracket, and a trolley. The trolley is provided with a drive wheel adapted and connected to the guide rail. The sensor festoon bracket is provided with a microseismic sensor festoon, and the trolley festoon bracket is provided with a trolley festoon. The trolley is provided with a collaborative robot for clamping a removable anchoring device, and a collaborative robot control cabinet connected thereto. An automatic microseismic monitoring-intelligent rockburst early warning integrated method is further provided.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.