Patent · US Active

Automatic staging of multiple HVAC systems during a peak demand response

US12203671B2 · kind B2 · utility

0Cited by
5References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 7, 2023
Grant dateJan 21, 2025
Priority date
Expiry dateSep 7, 2043

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF24F2140/60
  • WIPO fieldThermal processes and apparatus
  • WIPO sectorMechanical engineering

Abstract

A system includes multiple HVAC systems. After receiving a demand request, a multiple-system controller a first anticipated power consumption associated with operating a first HVAC system at a first temperature setpoint during a future period of time of the demand response request and a second anticipated power consumption associated with operating a second HVAC system at a second temperature setpoint during the future period of time. Based at least in part on the first and the second anticipated power consumptions, a staging schedule is determined that indicates when to operate the first and second HVAC systems.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.