Automatic staging of multiple HVAC systems during a peak demand response
US12203671B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 7, 2023 |
| Grant date | Jan 21, 2025 |
| Priority date | — |
| Expiry date | Sep 7, 2043 |
Classification
- Technology area (CPC F)Mechanical Engineering; Lighting; Heating
- CPC primaryF24F2140/60
- WIPO fieldThermal processes and apparatus
- WIPO sectorMechanical engineering
Abstract
A system includes multiple HVAC systems. After receiving a demand request, a multiple-system controller a first anticipated power consumption associated with operating a first HVAC system at a first temperature setpoint during a future period of time of the demand response request and a second anticipated power consumption associated with operating a second HVAC system at a second temperature setpoint during the future period of time. Based at least in part on the first and the second anticipated power consumptions, a staging schedule is determined that indicates when to operate the first and second HVAC systems.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.