Method and system for determining a geologically-guided assessment for managing drilling
US12215584B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 25, 2022 |
| Grant date | Feb 4, 2025 |
| Priority date | — |
| Expiry date | Apr 29, 2043 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B2200/22
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method may include obtaining acquired drilling parameter data regarding a drilling parameter in real-time during a drilling operation for a predetermined well. The method may include determining, based on a drilling cost model, first drilling cost data using the acquired drilling parameter data. The method may include determining whether the first drilling cost data satisfies a predetermined criterion. The method may include determining, in response determining that the first drilling cost data fails to satisfy the predetermined criterion, a replacement component for the drilling operation. The method may include determining, based on the drilling cost model, second drilling cost data based on using the replacement component for the drilling operation. The method may include transmitting a command to update the drilling operation by changing a drilling system to use the replacement component in response to determining that the second drilling cost data satisfies the predetermined criterion.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.