Construction method for flood storage area ecological wetland oriented to multi-target collaborative promotion
US12234617B1 · kind B1 · utility
Assignees
Inventors
Key dates
| Filing date | Aug 22, 2024 |
| Grant date | Feb 25, 2025 |
| Priority date | — |
| Expiry date | Aug 22, 2044 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE02B8/02
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
The provided is a construction method for a flood storage area ecological wetland oriented to multi-target collaborative promotion. The construction method includes: I. carrying out ecological wetland construction on a flood storage area by taking promotion of agricultural production as a goal; II. according to a water purification target of the flood storage area of the ecological wetland and a current pollution condition in the flood storage area, constructing the ecological wetland based on improvement of the water purification target when the flood storage area does not reach the water purification target at present; and III, in order to improve the biodiversity, carrying out the following ecological wetland construction on the flood storage area. In the method, agricultural production, water purification and biodiversity improvement of the flood storage area are comprehensively considered. The method is the most effective way for multi-target collaborative promotion of the flood storage area.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.