Patent · US Active

Construction method for flood storage area ecological wetland oriented to multi-target collaborative promotion

US12234617B1 · kind B1 · utility

0Cited by
0References
5Claims
0Family size

Assignees

Inventors

Key dates

Filing dateAug 22, 2024
Grant dateFeb 25, 2025
Priority date
Expiry dateAug 22, 2044

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE02B8/02
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

The provided is a construction method for a flood storage area ecological wetland oriented to multi-target collaborative promotion. The construction method includes: I. carrying out ecological wetland construction on a flood storage area by taking promotion of agricultural production as a goal; II. according to a water purification target of the flood storage area of the ecological wetland and a current pollution condition in the flood storage area, constructing the ecological wetland based on improvement of the water purification target when the flood storage area does not reach the water purification target at present; and III, in order to improve the biodiversity, carrying out the following ecological wetland construction on the flood storage area. In the method, agricultural production, water purification and biodiversity improvement of the flood storage area are comprehensively considered. The method is the most effective way for multi-target collaborative promotion of the flood storage area.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.