System and method for developing green data center policies to minimize CO2 generated during execution of test suites on a per software feature testing basis
US12235752B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 3, 2023 |
| Grant date | Feb 25, 2025 |
| Priority date | — |
| Expiry date | Nov 3, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3684
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
An information handling system executing a software test suite green data center policy generation system comprising a network interface device receiving data center hardware utilization analytics and a software test suite identifier for a selected software test suit and a processor to identify a reserved capacity of the data center processing system reserved for general execution of software test suites according to general quality of service requirements for input/output commands and to predict a future data center processor utilization rate and execution duration for the selected software test suite by forecasting actual use of data center resources during a future execution of the selected software test suite that is below the reserved capacity, and the network interface device to transmit an instruction to throttle power supplied to an over-allocated portion of the data center resources from the reserved capacity duration execution of the selected software test suite.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.