Patent · US Active

Method of modelling a production well

US12241339B2 · kind B2 · utility

0Cited by
7References
32Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 8, 2021
Grant dateMar 4, 2025
Priority date
Expiry dateJun 29, 2041

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B2200/20
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method of modelling one of a plurality of hydrocarbon production wells, wherein each production well is associated with at least one control point in a flow path associated therewith. The method comprises: (i) generating a first model capable of describing for any one of the first plurality of production wells a relationship between flow parameters, well parameters and/or an associated status of the at least one control point, wherein the first model is parameterised by a set of first parameters representative of properties common to all of the first plurality of production wells. The model can be applied to estimate well parameters, flow parameters and/or the status of control points. In addition, the resultant models can be used to optimise production of the production well.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.