Patent · US Active

System and method for using baseload power of reserve GT system for improving GT emissions or grid stability

US12249838B2 · kind B2 · utility

0Cited by
0References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 2, 2021
Grant dateMar 11, 2025
Priority date
Expiry dateDec 2, 2041

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E60/36
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A system includes a gas turbine (GT) system at a power plant operatively coupled to a generator to always generate power at a baseload. A first portion of the GT system's baseload power is transmitted to an electric grid. Where demand for power from the grid does not exceed a threshold, a second portion of the GT system's baseload power is transmitted to a hydrogen-producing electrolyzer to generate hydrogen fuel for a second GT system. Where demand for power from the grid exceeds the threshold, a third portion of the GT system's baseload power is transmitted to the grid. The GT system always runs at baseload but is capable of providing increased power to the grid quickly, like conventional spinning reserves. The system improves efficiencies by running all GT systems at baseload, and reduces emissions for the second GT system by providing hydrogen fuel thereto when grid power demand allows.