Patent · US Active

Method for borehole completion

US12264566B2 · kind B2 · utility

0Cited by
2References
6Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 14, 2023
Grant dateApr 1, 2025
Priority date
Expiry dateApr 14, 2043

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/10
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for improved borehole completion. In one embodiment, the method comprises removing a section of casing entirely and cutting a notch through the cement and into the surrounding rock formation, wherein the notch optimally comprise a symmetric triangle terminating in a sharp point oriented perpendicular to the casing axis. Flow may be further optimized by extending the notch as far as practical into the rock matrix to increase the effective diameter of the wellbore and increase the length of the intersection between the fracture and the wellbore.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.