Scheduling project activities using twin computing simulation
US12282874B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 14, 2022 |
| Grant date | Apr 22, 2025 |
| Priority date | — |
| Expiry date | Feb 28, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/067
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A critical path based proactive optimization that includes collecting data on the tasks of contextual situation for performing a process and training a twin computing simulation model using the collected data for each task in the process. A contextual situation simulation is run using the simulation models for each task in the process to determine a critical path that causes delay in the process. An optimized task is determined from the tasks of the contextual situation using machine learning employing the collected data, wherein the optimized task mitigates delay in the process from the critical path.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.