Patent · US Active

Seamlessly implementing planned outages across network nodes

US12289211B1 · kind B1 · utility

0Cited by
3References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 13, 2023
Grant dateApr 29, 2025
Priority date
Expiry dateOct 13, 2043

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L41/082
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

A computer-implemented method, according to one approach, includes: sending a notification to a host regarding a first logical unit number (LUN) in response to receiving an indication that a first node will be taken offline. The first LUN that the notification is sent to has a preferred communication path that extends through the first node. Communication paths extending through the first node are blocked and communication paths extending through a second node are promoted. Moreover, in response to determining that existing I/O operations previously assigned to the first node have been completed, the first node is taken offline. I/O operations are thereby sent to the first LUN through the second node while the first node is offline.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.