Patent · US Active

Control of fracture growth during well operation

US12297725B2 · kind B2 · utility

0Cited by
3References
21Claims
0Family size

Assignees

Inventors

Key dates

Filing dateMay 2, 2022
Grant dateMay 13, 2025
Priority date
Expiry dateJun 20, 2043

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B47/06
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A dissipation equilibrium value for a well operation may be determined based on a height of a fracture within a layer and a limit on the change of the height of the fracture (fracture height change limit). A pressure limit for the well operation may be determined based on the dissipation equilibrium value, stress in the layer, and stress in a bounding layer. The pressure limit may be used to control the pressure of the well during the well operation, and prevent growth of the fracture beyond the fracture height change limit.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.