Cooler for cooling bulk material, in particular cement clinker
US12305922B2 · kind B2 · utility
Assignees
Inventors
Key dates
| Filing date | Mar 9, 2021 |
| Grant date | May 20, 2025 |
| Priority date | — |
| Expiry date | Feb 13, 2042 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E20/34
- WIPO fieldThermal processes and apparatus
- WIPO sectorMechanical engineering
Abstract
A cooler for cooling bulk material, in particular cement clinker, may include a cooling gas chamber through which a cooling gas flow for cooling the bulk material can flow in crosscurrent, and a conveying device for conveying the bulk material through the cooling gas chamber in a conveying direction. The cooling gas chamber may include a first cooling gas chamber portion with a first cooling gas flow and a second cooling gas chamber portion, adjoining the first cooling gas chamber portion in the conveying direction of the bulk material, with a second cooling gas stream. The cooler may include a separating apparatus for gastight separation of the cooling gas chamber portions from one another. The separating apparatus may have sealing element and at least one suspension element, to which a plurality of sealing elements are attached.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.