Patent · US Active

Beam-slab integrated prefabricated waffle slab structure and construction method thereof

US12312795B1 · kind B1 · utility

0Cited by
83References
9Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 24, 2025
Grant dateMay 27, 2025
Priority date
Expiry dateJan 24, 2045

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE04B2103/02
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A beam-slab integrated prefabricated waffle slab structure and a construction method thereof are provided, the structure includes columns, arranged in an array, and a beam and slab support element and a beam support element being disposed on each column; two ends of each prefabricated frame beam being respectively disposed on the beam support elements, a main support element being disposed on front and rear sidewalls of each prefabricated frame beam; prefabricated waffle beam-slab units, each disposed between the prefabricated frame beams. The construction method includes completing array construction of the columns; installing the beam and slab support element and the beam support element on each column; installing the prefabricated frame beam on two columns; installing the prefabricated waffle beam-slab units between the prefabricated frame beams; installing main beam top rebar skeletons and ribbed beam top rebar skeletons; installing horizontal slab rebars and longitudinal slab rebars; and pouring concrete at nodes.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.