Data construction system and data construction method
US12321388B2 · kind B2 · utility
Assignees
Inventors
Key dates
| Filing date | Aug 2, 2023 |
| Grant date | Jun 3, 2025 |
| Priority date | — |
| Expiry date | Sep 7, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F16/901
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A data construction system and a data construction method. The data construction system includes a construction process management unit and a data construction unit. The data construction unit is configured to receive an initiation construction request. The data construction unit obtains corresponding construction rule data from the construction process management unit according to the initiation construction request, and sends an obtaining source data request to the construction process management unit. The construction process management unit receives the obtaining source data request, and calculates a new access location according to a source data identification number and access location information in the obtaining source data request. The construction process management unit obtains corresponding source data according to the new access location, and updates the access location information according to the new access location. The construction process management unit sends the corresponding source data to the data construction unit.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.