Patent · US Active

Can-open master redundancy in PLC-based control system

US12323268B2 · kind B2 · utility

0Cited by
79References
14Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 16, 2023
Grant dateJun 3, 2025
Priority date
Expiry dateNov 16, 2043

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L2012/40215
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

A system for controlling equipment at a wellsite includes a surface PLC, a first subsea PLC, a second subsea PLC, a first CAN module, a second CAN module, and a CAN network. The surface PLC is configured to receive a parameter that is measured by a sensor and to transmit a first signal to the first subsea PLC, the second subsea PLC, or both in response to the parameter. The first subsea PLC or the second subsea PLC, or both are configured to transmit a second signal to the first CAN module, the second CAN module, or both in response to the first signal. The first CAN module, the second CAN module, or both are configured to transmit a third signal to the CAN network in response to the second signal. The CAN network is configured to control the equipment in response to the third signal.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.