Structure and construction method
US12331519B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 19, 2024 |
| Grant date | Jun 17, 2025 |
| Priority date | — |
| Expiry date | Nov 19, 2044 |
Classification
- Technology area (CPC B)Performing Operations; Transporting
- CPC primaryB32B2607/00
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A core wall structure is assembled by attaching together elements of lightweight thermal insulation material (16) and elements of mineral board (20), positioned between them to serve as webs (20) at spaced intervals. Opposing edges (22) of the webs (20) are exposed on outer surfaces (26,28) of the core wall structure, with recesses (24) around them. Skins (18) of cement-based plaster are applied to the outer surfaces (26,28) to cover the core wall structure at least in part and to embed the exposed edges (22) of the webs (20) at least in part in the cement-based plaster.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.