Patent · US Active

Automated regional failover

US12339753B2 · kind B2 · utility

0Cited by
11References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 4, 2024
Grant dateJun 24, 2025
Priority date
Expiry dateApr 4, 2044

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2201/85
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Disclosed herein are system, method, and computer program product embodiments for automatically failing over all services operating on a primary region to a secondary region upon detection or notification of a fault in the primary region. When a fault exists on the primary region, the method traverses each cluster containing services operating on the primary region and prepares an input file including a list of service names identifying each service operating on the primary region. Referencing the input file, the method fails over each service from the primary region to the secondary region by modifying a service weight corresponding to each service. This failover process of services may be done simultaneously with failing over any databases corresponding to the failed-over services from the primary region to the secondary region. The method may also introduce a sleep time after modifying each service weight to avoid any potential throttling issues.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.