Patent · US Active

Method and device for identifying full-section excavation parameters of large-section tunnel with broken surrounding rock

US12366679B2 · kind B2 · utility

0Cited by
0References
10Claims
0Family size

Assignees

Inventors

Key dates

Filing dateOct 11, 2024
Grant dateJul 22, 2025
Priority date
Expiry dateOct 11, 2044

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG01J2005/0077
  • WIPO fieldMeasurement
  • WIPO sectorInstruments

Abstract

Disclosed are a method and a device for identifying full-section excavation parameters of large-section tunnel with broken surrounding rock, capable of solving the problem of inaccurate arrangement of blasting hole points in tunnel excavation engineering, and including the following steps: establishing a three-dimensional finite element model based on a blasting section design of a tunnel; performing a simulation with the three-dimensional finite element model based on blasting design parameters to obtain blasting quality parameters; selecting a group closest to a preset quality parameter from multiple groups of the blasting design parameters as target blasting design parameters, wherein the preset quality parameter is an acceptance grade standard of the tunnel; obtaining first thermal imaging information of a first hot spot of a surface to be blasted; calibrating actual hole spacing parameters based on the first thermal imaging information and the target blasting design parameters.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.