Patent · US Active

Facilitating a scheduler for distributed unit power management in advanced communication networks

US12429938B2 · kind B2 · utility

0Cited by
2References
20Claims
0Family size

Assignee

Inventor

Key dates

Filing dateSep 25, 2023
Grant dateSep 30, 2025
Priority date
Expiry dateJan 25, 2044

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04W52/028
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

Facilitating a scheduler for distributed unit power management in advanced communication networks is provided herein. A method includes, based on a processing load of a group of core processors being determined to be below a threshold traffic amount for a first transmission time slot, selecting, by network equipment comprising a processor, a core processor of the group of core processors for power management, resulting in an identified core processor. Selection of the core processor can be based on a configuration of the identified core processor. The method also includes, based on a category assigned to the identified core processor, controlling, by the network equipment, a power consumption of the identified core processor during a second transmission time slot. The network equipment comprises a distributed unit, and controlling the power consumption is performed in a layer 2 scheduler of the distributed unit.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.