Patent · US Expired

Time delayed relay sequencer and alarm reset for a gas turbine local maintenance controller

US4107542A · kind A · utility

1Cited by
1References
9Claims
0Family size

Assignee

Inventor

Key dates

Filing dateFeb 19, 1975
Grant dateAug 15, 1978
Priority date
Expiry dateFeb 19, 1995

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG05B9/02
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

The majority of a number of relays is held in a quiescent state, without power, in a local maintenance controller preparatory to assumption of control of a gas turbine power plant. Control transfer may be manually requested or may occur automatically in response to failure of the plant's primary control system. Regardless of the cause of transfer, a time delay relay is utilized to allow the quiescent relays sufficient latching time. The time delay period is chosen to reflect the maximum period of time for which a lack of trip availability can be safely tolerated. The relay sequencing arrangement is adapted so that when the quiescent relays are energized, alarm circuitry for predetermined plant parameters is automatically reset for on-line transfers, thereby allowing more rapid and efficient transfer and minimizing the need for operator intervention. Alternative means for manually resetting the alarm circuitry is also provided.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.