Patent · US Expired

Method of immediate estimation of compressive strength of concrete through quick hardening

US4182191A · kind A · utility

12Cited by
1References
6Claims
0Family size

Inventor

Key dates

Filing dateSep 6, 1978
Grant dateJan 8, 1980
Priority date
Expiry dateSep 6, 1998

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG01N2203/0092
  • WIPO fieldMeasurement
  • WIPO sectorInstruments

Abstract

Immediate estimation of compressive strength of concrete at the standard curing age of concrete of 28 days being not affected by the weathering of cement used in the concrete is carried out by the addition of an alkali hydroxide as well as a setting accelerator to the mortar portion obtained by wet screening of fresh concrete.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.