Method of improving load response on coal-fired boilers

US4332207A · kind A · utility

10Cited by
8References
4Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 30, 1980
Grant dateJun 1, 1982
Priority date
Expiry dateOct 30, 2000

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF23K1/00
  • WIPO fieldThermal processes and apparatus
  • WIPO sectorMechanical engineering

Abstract

A method for rapidly changing the amount of pulverized coal supplied to a coal-fired furnace (10) equipped with a coal pulverizer (20) from a first steady-state level to a second steady-state level in response to a change in operating load demand. The amount of pulverized coal supplied to the furnace is instantaneously increased by providing pulverized coal to the furnace from a source (42) independent of the pulverizer or instantaneously decreased by diverting away from the furnace a portion of the pulverized coal being supplied by the pulverizer.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.