Method of improving load response on coal-fired boilers
US4332207A · kind A · utility
Assignee
Inventors
Key dates
| Filing date | Oct 30, 1980 |
| Grant date | Jun 1, 1982 |
| Priority date | — |
| Expiry date | Oct 30, 2000 |
Classification
- Technology area (CPC F)Mechanical Engineering; Lighting; Heating
- CPC primaryF23K1/00
- WIPO fieldThermal processes and apparatus
- WIPO sectorMechanical engineering
Abstract
A method for rapidly changing the amount of pulverized coal supplied to a coal-fired furnace (10) equipped with a coal pulverizer (20) from a first steady-state level to a second steady-state level in response to a change in operating load demand. The amount of pulverized coal supplied to the furnace is instantaneously increased by providing pulverized coal to the furnace from a source (42) independent of the pulverizer or instantaneously decreased by diverting away from the furnace a portion of the pulverized coal being supplied by the pulverizer.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.