Patent · US Expired

Method for bulking full a retort

US4449753A · kind A · utility

1Cited by
14References
57Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 1, 1982
Grant dateMay 22, 1984
Priority date
Expiry dateJun 1, 2002

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21C41/24
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for forming an in situ oil shale retort in a subterranean formation containing oil shale is provided. The in situ oil shale retort has top, bottom, and generally vertically extending side boundaries of unfragmented formation and contains a body of expanded oil shale formation that completely fills the retort to its top boundary. The retort is bulked full by explosively expanding a layer above a fragmented permeable mass of formation particles forming part of the body of expanded formation in the retort. The layer is expanded with an available void fraction of no more than about ten percent.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.