Patent · US Expired

Producing hydrocarbons through successively perforated intervals of a horizontal well between two vertical wells

US4682652A · kind A · utility

301Cited by
10References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 30, 1986
Grant dateJul 28, 1987
Priority date
Expiry dateJun 30, 2006

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/305
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

The invention uses two vertical wells and a horizotal well located within the underground formation extending between the two vertical wells. A thermal fluid is injected into the formation through the first vertical well. Hydrocarbons and other fluids are produced from the horizontal well through a first perforated interval located near the first vertical well. After depleting this area of the formation, the first perforated interval is closed off and the process is repeated for successively perforated intervals of the horizontal well, all of which are farther from the first vertical well than the preceding perforated intervals.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.