Patent · US Expired

System for economic unit load distribution during process load transition

US4745758A · kind A · utility

20Cited by
2References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 15, 1986
Grant dateMay 24, 1988
Priority date
Expiry dateDec 15, 2006

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG05D23/1912
  • WIPO fieldThermal processes and apparatus
  • WIPO sectorMechanical engineering

Abstract

In a plant including a multiplicity of energy conversion units which together supply load upon demand to a given process through a common junction, a system is included to economically optimize the load distribution among the multiple units dynamically during the transition of process load demand from one state to another such that when the process load supply reaches the other process demand state, the energy conversion units are substantially in their economically optimum individual load generating states. Typical unit load dispatching plants may include a boiler house in which a multiplicity of boilers are coupled to a common header for supplying stream flow to the particular process, a power turbogeneration system in which a multiplicity of turbogenerating units supply power to a power system network through a common bus and a heat exchange industrial process in which a multiplicity of power-driven compressors are used together with corresponding chiller units for maintaining the temperature of a common coolant under varying coolant flow demand conditions.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.