Job scheduling method and system

US4852001A · kind A · utility

227Cited by
7References
6Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 17, 1987
Grant dateJul 25, 1989
Priority date
Expiry dateJul 17, 2007

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A job scheduling method for scheduling of job allocation to various resources, wherein each workload of a job is allocated to each time unit along a time axis in units of job and resource type. Based on the workload allocated in units of resource type, an initial workload for all resources at each time unit is calculated. A first workload balancing is performed for an initial workload at a time unit exceeding a resource capacity so as to balance the initial workload within the resource capacity. Thereafter, a second workload balancing is performed so as to balance a workload allocated in units of resource type within its resource capacity.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.