Patent · US Expired

Method of conducting well operations from a moveable floating platform

US4972907A · kind A · utility

24Cited by
11References
13Claims
0Family size

Assignee

Inventor

Key dates

Filing dateAug 10, 1987
Grant dateNov 27, 1990
Priority date
Expiry dateAug 10, 2007

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/01
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method is described for conducting well operations from a floating platform that may be moved to various locations above subterranean formations. Marine risers that have been previously connected to the platform flex sufficiently to allow this movement. The mobility of the platform allows well drilling, completion, producing, and workover activities to be conducted simultaneously through the risers attached to the platform. The mobility of the platform also allows new wells to be drilled at more preferable locations than those that would be available from a fixed bottom supported well template.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.