Patent · US Expired

Method of renovating the control system for controlling control clusters in a nuclear reactor, and a corresponding control system

US5059382A · kind A · utility

2Cited by
4References
2Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 13, 1989
Grant dateOct 22, 1991
Priority date
Expiry dateJan 13, 2009

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E30/30
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

Control clusters, each of which comprises a plurality of neutron-absorbing rods, are operable by means of electromagnetic mechanisms whose coils are powered by power bridges driven from a control desk (11). The control system includes a controlling hard-wired logic circuit (12) serving the desk and supervising a plurality of hard-wired logic interfaces each of which serves a subgroup (10) of electromagnetic mechanisms for a determined number of clusters. The static power assemblies (9) each including a hard-wired logic interface and the power bridges of the subgroup(s) (10) served thereby are successively and independently replaced by at least one electronic power assembly (23) constituted by a computer and the power bridges of a subgroup served thereby.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.