Patent · US Expired

Pore pressure prediction method

US5128866A · kind A · utility

50Cited by
9References
10Claims
0Family size

Assignee

Inventor

Key dates

Filing dateJun 8, 1990
Grant dateJul 7, 1992
Priority date
Expiry dateJun 8, 2010

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B49/003
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method of predicting pore pressures at a proposed drilling location using Interval Transit Times derived from seismic data and Interval Transit Times from a calibrated normal geopressure trend. Seismic Interval Transit Times derived pore pressures and actual pore pressures derived from logs in a drilled well at an offset location are used to correlate graphically or analytically the seismic Interval Transit Times to normal geopressure interval transit times from a proposed drilling location to be used in the prediction of pore pressures at the proposed location.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.