Patent · US Expired

Totally integrated construction cost estimating, analysis, and reporting system

US5189606A · kind A · utility

347Cited by
11References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 14, 1991
Grant dateFeb 23, 1993
Priority date
Expiry dateMay 14, 2011

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S706/923
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

CCMAS is an integrated construction cost generator which may be used to develop costs for construction projects; to analyze and estimate facilities associated with major weapons programs; for administrative, medical and support facilities as well as runway/taxiways; and for developing the life cycle costs for various construction projects. Its uses parametric estimating techniques with a finite field of both codified and unstructured data elements in a unique process which may be accomplished with or without detailed plans or specifications. The system contains more than 900 types of Air Force facilities as well as the quantities of each product required to complete each building type. Estimating tools used include direct costs, life cycle costs and modifiers. Direct costs are further broken down into generic models, a comparative system, and a quantity takeoff (QTO) system. CCMAS has been found to be three times more accurate than conventional architectural and engineering costing techniques.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.