Patent · US Expired

Floating platform shallow draft hull/deck mating

US5237949A · kind A · utility

3Cited by
4References
8Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 29, 1992
Grant dateAug 24, 1993
Priority date
Expiry dateMay 29, 2012

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE02B17/02
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for building and assembling an offshore platform whose normal draft exceeds the depth of waterways between the building site and use location of the platform. The hull and deck of the platform are built separately in a shallow graving dock. The deck is then elevated, the graving dock partially flooded and the hull floated into position and mated to the deck. A modified form of the invention is the building of the hull and deck as a single structure and use of the barge to support a portion of the weight of the platform. The graving dock is then flooded to maximum depth, a barge is floated under the deck and ballasted down to a select draft. The barge is attached to the deck and then deballasted to partially support the platform structure and reduce its overall draft.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.